Highway 65 – Southern Section

Dovrat to Umm al-Ranam

Project Overview

Start Date :

2023

Contractor:

Shapir Engineering and Industry Ltd.

Customer:

The National Roads Company Ltd.
 

Total construction area:

Approximately 80,000 square meters
 

Status:

In progress
 

Total cost:

0 M NIS

The project is the construction of a two-lane main road on a new route with a length of approximately 6.0 km, including two separators: Beit Keshet and Ilaniya, which include service roads and connections to local/regional roads and access to the settlements Beit Keshet, Ilaniya, Sde Ilan, IDF camps; Naftali and Havat Hashomer.