Road 38 – Givat Sharett and Tel Beit Shemesh Interchange
Project Overview
Project Completion:
Since 2022
Contractor:
Shapir Engineering and Industry Ltd.
Customer:
Netivei Israel Ltd
Total construction area:
Approximately 80,000 square meters
Status:
In progress
Total cost:
0
M NIS
Widening of Road 38 into a divided highway with two lanes in each direction.
The expansion covers approximately 4 kilometers (about 2.5 miles).
The scope of work includes bridge construction, culverts, retaining walls, concrete channels, earthworks and paving, lighting, and site development.