Road Menahem Begin 156, Tel Aviv

Neot Afek – Bridging Works

Kiryat Bialik

Project Overview

Start Date :

Ongoing since 2023

Contractor:

Shapir Engineering and Industry Ltd.

Customer:

 Israel Land Authority
 

Total construction area:

Approximately 80,000 square meters
 

Status:

In progress
 

Total cost:

0 M NIS

Construction of three bridges – the Railway Bridge (HaT”L), a pedestrian bridge, and the Jabotinsky Bridge.
The work includes concrete structures, earthworks, and paving.

Search