Highway 16
Project Overview
Start Date :
2019
Contractor:
Shapir Engineering Ltd. joint venture with Impresa Pizzaroti & C. Spa
Customer:
Netivei Israel Ltd.
Total construction area:
Approximately 80,000 square meters
Status:
Completed (2023)
Total cost:
0
B NIS
Construction of an exit interchange connecting Highway No. 16 with the upgraded Highway No. 1 and the local road system, tunnels – Har Nof, 1.5 km long, from the Ravida section connecting Highway No. 16 to Givat Shaul, the Givat Shaul road, a pair of Yaffa Nof tunnels, approximately 1.5 km long, each with 3 lanes in each direction, from the Bayt section.