Road Menahem Begin 156, Tel Aviv

Highway 16

BOT Project

Project Overview

Start Date :

2019

Contractor:

Shapir Engineering Ltd. joint venture with Impresa Pizzaroti & C. Spa

Customer:

Netivei Israel Ltd.
 

Total construction area:

Approximately 80,000 square meters
 

Status:

Completed (2023)

Total cost:

0 B NIS

Construction of an exit interchange connecting Highway No. 16 with the upgraded Highway No. 1 and the local road system, tunnels – Har Nof, 1.5 km long, from the Ravida section connecting Highway No. 16 to Givat Shaul, the Givat Shaul road, a pair of Yaffa Nof tunnels, approximately 1.5 km long, each with 3 lanes in each direction, from the Bayt section.