Highway 41
Project Overview
Start Date :
2023
Contractor:
Shapir Engineering and Industry Ltd.
Customer:
The National Roads Company Ltd.
Total construction area:
Approximately 80,000 square meters
Status:
In progress
Total cost:
0
M NIS
The project involves the expansion of Highway 41 over a length of approximately 3.3 km, connecting to the Ashdod Interchange in the east and a new junction in the west. The project includes the construction of two interchanges: Nir Galim Interchange and Bnei Brith Interchange. A total of six bridges are being built, including one segmental bridge, water channels, agricultural crossings, waterworks, sewage systems, drainage, the establishment of a pumping station, construction of retaining walls, an acoustic wall, concrete channels, culverts, and frame and cantilever signage bridges.