Road Menahem Begin 156, Tel Aviv

MEP Services for the Construction of a Logistics Building

Lod

Project Overview

Start Date :

2013

Contractor:

Minrav Ltd.

Customer:

Israel Railways Ltd., through Wexman-Govrin-Geba Ltd.

Total construction area:

Over 50,000 square meters
 

Status:

Completed (2017)
 

Total cost:

0 M NIS

The project involved the construction of an 8-floor building, including all systems: electrical, communication, HVAC, fire detection and suppression, elevators, plumbing, and site development. Each typical floor spans approximately 3,200 square meters. The construction method was conventional, involving a raft foundation, cast-in-place concrete columns, beams, and ceilings, combined with precast slabs.

Highway 41 - Nir Galim Interchange and Bnei Brith Interchange

Search